Chicago Tube & Iron

When CTI decided to move their facility north to Fond du Lac Wisconsin they selected MSI General Corp as their design/build partner. Their main goal was to have a northern distribution center that allowed them to ship steel to their Fox Valley location, and surrounding the facility are clients from a central location.

The new 117,000 square foot facility includes drive through truck bays to allow the steel to be loaded directly from a rack by crane speeding up the delivery process. This is a high bay pre-cast concrete warehouse with architectural appeal.