160,000 SF new building and 67,000 SF addition five years later
Design Elements - cranes, locker room, machine shop, mezzanine, office
The facility included machining areas, heat treating equipment, sand blast equipment, several production lines for drawing metal parts, 20,000 SF of mezzanines, complex mechanical systems, 11 bridge cranes, and 16 jib cranes, corporate offices, and locker rooms.
Space for three manufacturing lines was added five years after the original building was constructed.
Charter Wire is a manufacturer and supplier of cold-rolled and formed steel solutions.